Home ProductsThin Blade Slitter Scorer Machine

Computer Controlled Thin Blade Slitter Scorer Automatic Change Order Precise Cutting Nc

Computer Controlled Thin Blade Slitter Scorer Automatic Change Order Precise Cutting Nc

  • Computer Controlled Thin Blade Slitter Scorer Automatic Change Order Precise Cutting Nc
  • Computer Controlled Thin Blade Slitter Scorer Automatic Change Order Precise Cutting Nc
  • Computer Controlled Thin Blade Slitter Scorer Automatic Change Order Precise Cutting Nc
  • Computer Controlled Thin Blade Slitter Scorer Automatic Change Order Precise Cutting Nc
  • Computer Controlled Thin Blade Slitter Scorer Automatic Change Order Precise Cutting Nc
  • Computer Controlled Thin Blade Slitter Scorer Automatic Change Order Precise Cutting Nc
  • Computer Controlled Thin Blade Slitter Scorer Automatic Change Order Precise Cutting Nc
Computer Controlled Thin Blade Slitter Scorer Automatic Change Order Precise Cutting Nc
Product Details:
Place of Origin: Made In China Hebei
Brand Name: SOOME
Certification: CE
Model Number: SMBD-BNC
Payment & Shipping Terms:
Minimum Order Quantity: 1Set
Price: Contact
Packaging Details: Wooden case or plastic film;LCL or 20' Container
Delivery Time: 45 Days /30 Days
Payment Terms: L/C, T/T
Supply Ability: 20 Pcs/month
Contact Now
Detailed Product Description
Speed: 150,200,250m/min Blade&scorer: 5&8,6&10,7&12
Order Change: 1-3s(servo Type) 3-8s(invert Type) Precision: ±0.5mm
Min.slitting: 135mm Min.scorer: 0mm
Correction Range: 200mm Width: 1800mm,2200mm,2500mm
Power: 25kw,30kw,35kw
Highlight:

nc thin blade slitter scorer machine

,

computer controlled thin blade slitter scorer

,

precise cutting thin blade slitter scorer

Computer-controlled,Automatic change order,Precise cutting NC Thin Blade Slitter Scorer

1 . Summarize

 

Product overview:As an important equipment of corrugated cadres,complete the high quality line of cardboard and precise cutting and the size is very precise.Adopt computer-controlled,automatic change order,and reduce waste,improve work efficiency.

 

2 .  Features

 

1) High quality touch screen and PLC equipped composing the CNC system,connect to the production line.

2) High quality beeline rail and high-precision screw conveying guarantees the precision.

3) A memory of orders,realize non-stop automatic or manual change.

4) Speed synchronizes with board speed.Standard communication interface,easy to link with management system.

5) Alloyed steel thin-blades,sharp and long life of over 8 million meters,auto sharpening.

6) The knife for computer control automatic or manual knife sharpening,edge trimming knife,improve production efficiency.

7) Three types of scorers:convex to concave(three lines).convex to concave(five lines),convex to flat.

8) Two rows of scorers,realizes minimum scorer spacing is 0mm.

9) Computer control score-depth,high quality scorer,more steady.

10) Using the synchronous belt transmission ,low noise,prolong using time.

11) Standard motorized body left-right rectification system 200mm.

 

3. Technical index

 

 

width 1800mm 2200mm 2500mm
speed 150,200,250m/min
Blade&scorer 5&8,6&10,7&12
Order change

1-3s(servo type)

3-8s(invert type)

precision ±0.5mm
Min.slitting 135mm
Min.scorer 0mm
Correction range

200mm

power

25kw

30kw 35kw
machine size

3900*1800*2450 (mm)

4300*1800*2450(mm) 4500*1800*2450(mm)

 

 

Computer Controlled Thin Blade Slitter Scorer Automatic Change Order Precise Cutting Nc 0

Contact Details
HEBEI SOOME PACKAGING MACHINERY CO.,LTD

Contact Person: Angie Guo

Tel: 18713720658

Fax: 86-0317-7800709

Send your inquiry directly to us (0 / 3000)

Best Products
Other Products